The skate park in Glückaufpark Hassel has been at the top of the wish list of young people for a long time – on 28.10.2021 the construction work has started! It should be ready in about eight weeks. The most modern skate facility in Gelsenkirchen can be used not only with skateboards, but also with inline skates, BMX bikes or even wheelchairs. Different elements offer different levels of difficulty. You can find more information about the press date of the […]
At the BDLA day at the planer Forum on 28.10.2021 Ralf Maier will give a lecture about inclusion in the planning of skateparks as a matter of course.
In the small bowl, the tile level and first pool copings were set last week. In the large bowl, the first transition was concreted and approx. 85% of the cleanliness layer was laid.
The first transitions in the large bowl have now also been concreted and further parts of the reinforcement have been installed.
No more throaway coffeecups! Betonlandschaften emaille mugs for the construction site at Skatepark Bonn.
On September 29th we were in Baumholder for the safety inspection of the recently completed Pumptrack. Built by pumptrack.de.
In Bonn, the first transitions have already been completed in the small bowl and the recess for the tiling has been prepared. At the large bowl, the steel coping has already been set and the substrate is being prepared.
The clean layer has already been placed at the two bowls and in the snakerun, and a large part of the reinforcement has been incorporated.
We visited Kamp-Lintfort on September 16th for the first user participation workshop. At the appointment, locals contributed their personal wishes and opinions on the planning of the new skatepark, parkour facility and pumptrack. In total, about forty participants were on site. Now we will work out and present a first preliminary draft based on the workshop and then meet with the local users to discuss it again.
On September 15th we were in Ahaus for the safety inspection of the recently finished Pumptrack.
The movement landscape we planned in the landscape park Reese-Kaserne in Augsburg, graces the cover of the Freiraumgestalter magazine 04/2021. More information about the project
In Bonn today the first part of Transition was poured and shaped.
On September 9, the new pumptrack and climbing rock was ceremoniously opened in Rheinberg. Besides the mayor and project initiators there were also some experienced bikers who showed the newbies how to ride the pumptrack.
A new pump track and other sports facilities will be built at Schirrhof. Come by and contribute your ideas! When and where. September 16 at 5 p.m. Schirrhof Friedrich-Heinrich-Allee 79 47475 Kamp-Lintfort Contact: Jennifer Wachtendonk jennifer.wachtendonk@kamp-lintfort.de +49 (0) 2842 912 137 A new pump track and other sports facilities will be built at Schirrhof. Come by and contribute your ideas! When and where. September 16 at 5 p.m. Schirrhof Friedrich-Heinrich-Allee 79 47475 Kamp-Lintfort Contact: Jennifer Wachtendonk jennifer.wachtendonk@kamp-lintfort.de +49 […]
In the current issue of the “sb” 4/2021 there is a detailed article about the new Bikepark
The construction site in Dortmund Hombruch is developing day by day.
Heavy equipment is already being used on the construction site in Gelsenkirchen. Already a part of the
A small overview of the construction site in Dortmund Hombruch, from a bird’s eye view.
At the construction site meeting on August 25, the contours of the small bowl are already visible.
On August 12, we were in Recklinghausen for the safety inspection of the recently completed miniramp.
On August 12th we were in Neuler for the safety inspection of the recently finished Pumptrack.
The construction site Dortmund Hombruch is running at full speed.
On August 9th we were in Neuler for the safety inspection of the recently finished Pumptrack.
On August 9th we were in Aalen for the safety inspection of the recently finished Pumptrack.
On July 29, GaLa-Bau built part of the construction road, which will be completed this week. Subsequently, it continues directly in the skatepark Bonn with the excavation for the two planned Bowls.
New pictures of the skatepark renovation in the skate and bike park in Unterschleissheim near Lohof. Now the bowl and many elements of the street area is already finished. This week was also delivered the first container and one looks forward to the further construction progress. Pictures by SV Lohhof
“Into the Park” is the headline of the article about Augsburg’s Westpark, in the current issue 15.2021 of “Bauwelt”.
In the current issue of “sb” 2/2021 there is a short article about the new
In the Playground@Landscape issue 3/2021 there is a detailed article about the new bike park